PG&E needed to lay utility lines in a new residential development with no existing records. Charge, the EPC in charge of the job, hired a premium locator to mark the area, but brought in Exodigo to conduct a Quality Assurance layer.
Exodigo scanned the area and detected twice as many lines as the premium locator. After verifying these findings with test potholes, Charge redesigned the project based on Exodigo’s utility-free areas (“green corridors”), enabling them to avoid five utility strikes from missed lines and reduce the number of required potholes by 50 percent.
Date:
March 2022
Location:
Santa Rosa, CA
Acres:
Scan Days:
Platform:
Exodigo’s technology detected twice as many lines (shown in red and black) as premium locators did using conventional methods (shown in white).
Local construction laws required Charge to validate line locations by digging. The subsequent potholes verified all of Exodigo’s findings.
Exodigo exceeded all our expectations. They found twice as many lines as what the premium locators we called had found. This avoided a number of utility strikes that were in the right-of-way and would have been a major issue for our team and the execution of the project."
Interested in learning more? Explore our featured media coverage for this project here.